 |
Step 1
After meeting with the homeowner, designing a pool to fit their needs, and placement in their yard is established the machines are delivered and excavation begins. |
| |
|
 |
Step 2
After Excavation is complete, We Begin Build you pool. Poolscape Pools has the exclusive rights to the strongest steel frame pool in the industry, The Sterling Edition Pool. |
| |
|
 |
Step 3
Once the Framework is assembled The pool is now ready for the concrete foundation. This ensures the pool from any movement for the life of the Pool. |
| |
|
 |
Step 4
After the foundation is poured and set, the pool is now ready for backfilling and rough grading. |
| |
|
 |
Step 5
Before the liner can be placed the the "pool base" must be prepared, a mixture of mason sand and portland cement, the strongest pool bottom offered. |
| |
|
 |
Step 6
Once the liner is installed it is now time to fill er up! |
| |
|
 |
Step 7
We now begin the process of designing and installing the patio. One that fits the needs of the homeowner as well as their budget. |
| |
|
 |
Your New Poolscape Pool! |